Type of project: Transformation and vertical extension
Type of building: Offices and workshops
Construction materials: Old bricks and new steel structure
Building energy reference area (ERA): 1416 m²
Floors: 6
Location: Winterthur (ZU), CH
Project phase: Completed in 2021
799
kg/m²353
kg CO2-eq./m²31
kg C/m²245
kg CO2-eq./m²13
% of total mass25
% of total mass116
km (weighted average)
⚠ Changing the visibility of the columns can mess the table display. 🔧To re-arrange the columns, double-click on the "n°" column's title.